1923
1923
1923

Entry of Kraftanlagen Aktiengesellschaft Mannheim in the commercial register

1928
1928
1928

Large power plant in Mannheim: Participation in the construction of Europe‘s first 100-bar upstream plant

1947
1947
1947

In the reconstruction phase, Kraftanlagen Heidelberg expands its fields of activity to include heating technology and pipeline construction, but also advises on the „rational use of energy“.

1953
1953

Foundation of the Munich Technical Office of Kraftanlagen Heidelberg AG

1962
1962-1965
1962-1965

Orders from Shell, Esso and Snam Progetti at their refineries in Ingolstadt

1965
1965

Consultancy department attached to the Munich office (the nucleus of ECM, founded in 1993)

1966
seit 1966

Planning, delivery, installation and maintenance of media and operating equipment pipelines for BMW in Munich, Dingolfing, Landshut, Garching and Aschheim

1966

District heating in Nuremberg South: first general contractor contract for Kraftanlagen Munich

1969
1969-1972
1969-1972

Heat supply for the Olympic grounds Oberwiesenfeld —first independent construction of larger building services systems by the Munich branch office

1970
1970er

Kraftanlagen plays a key role in the development of a natural gas network in Bavaria

1970er

Assembly work for OMV and Wacker in Burghausen

1973
1973

Entry of Kraftanlagen Heidelberg into nuclear technology

1980
1980
1980

Foundation of the Hamburg branch (becomes Kraftanlagen Hamburg in 1993)

1985
1985-1989

Framework contracts in the “Chemical Triangle” Burghausen, establishment of production and office on site

1999
1999
1999

An order from RWE for the Niederaussem power plant brings entry into high-pressure piping construction

2000
ab 2000
ab 2000

Entry into the biomass cogeneration plant sector. Plant in Pfaffenhofen with 6 MW electrical and 27 MW thermal output

2001
2001

Reinforcement of activities in the chemical and petrochemical sector with the establishment of branches in Nünchritz, Brussels and Vienna. Foundation of a sales office in Berlin

2006
2006
2006

Major orders from RWE for the coal-fired power plants in Neurath, Westfalen, Ensdorf and Eemshaven

2007
2007
2007

Foundation of Kraftanlagen Romania

2007
2007

TMC project for OMV in Burghausen. At 64 million euros, the largest single project for the industry business unit. More than 650 employees are working on the construction site.

2007
2007

Central Linzdistrict heating power plant. Record order for Kraftanlagen München as general contractor of over 100 million euros

2007
2007

Jülich experimental solar thermal power plant

2007
2007

Acquisition of FINOW Rohrsysteme and thus entry into prefabrication in HP/MD pipeline construction with inductive bending

2010
2010
2010

In Kladno Kraftanlagen for the first time is general contractor for a fast-regulating power plant with district heat extraction. Largest turnkey power plant unit built to date (135 MW)

2012
2012
2012

Shutdown work at the OMV Petrom refinery in Ploiești. Kraftanlagen Romania is on site with around 1,400 employees from 30 countries

2015
seit 2015

Kraftanlagen positions itself as a partner in the dismantling of nuclear facilities (founding of Swiss Decommissioning, cooperation with Steag Energy Services)

2016
2016

With the acquisitions of IPIP and Ebling, the Kraftanlagen Group is expanding its engineering expertise and strengthe-ning its market presence in the Rhine-Main region in the field of technical building equipment.

2016
2016

Power-to-heat is a fast-growing market and is off to a good start for Kraftanlagen München

2017
2017
2017

Entry into the hydrogen market by expanding the portfolio to include turnkey power-to-gas production plants. Acquisition of Diamond Lite

2018
2018
2018

Kraftanlagen belongs to Bouygues Construction S.A.

2020
2020
2020

Kraftanlagen Heidelberg delivers two vitrification plants for highly radioactive waste to China. The first will go into operation in Sichuan. Another is scheduled to start up in Diwopu in 2030.

2021
2021

Entry into the data centre market with a major project in the Frankfurt area in cooperation with Bouygues Energies & Services

2020
2020

The 190 MW Kiel coastal power plant, which was realised as a general contractor, makes an important contribution to the energy transition with 20 gas engines,heat storage and an electrode boiler.

2021
2021
2021

Participation in the construction of a pioneering large-scale biofuel production plant in Romania

2021
kraftanlagen

Kraftanlagen München GmbH becomes Kraftanlagen Energies & Services GmbH

2022
2022
2022

General contractor for a 5 MW hydrogen generation plant in Pfeffenhausen near Landshut

2022
2022

Expansion and modernisation of a gas and steam power plant of InfraLeuna. General contractor for planning, construction and commissioning

2023
2023
2023

The Kraftanlagen Group is transferred from the Bouygues Construction sector to the Equans sector within the Bouygues Group

2023
2023

Delfzijl: Front-end engineering design (FEED) for a 40 MW HyCC plant to supply hydrogen for the production of sustainable aviation fuel from 2026. First plant of this size