Green power replaces natural gas and coal in process heat generation (high-pressure steam, thermal oil, hot air) with the use of the power-to-heat storage Green Heat Module. Together with the...
Read More          
Hamburg Green Hydrogen Hub has commissioned  Kraftanlagen to construct the infrastructure for  100 MW electrolyzer 16.10.2025
Major construction Progress for the new base oil plant at Shell Rheinland: components for the Electric process furnace have been successfully delivered 09.09.2025
Kraftanlagen presents itself with a new Corporate Design – a strong sign for the future! 01.08.2025
Hansastraße 23 
80686 München, Deutschland

