Skip to main content

Where vehicles are manufactured on a large scale, safety, system availability and technical standards are inextricably linked. Production and logistics concepts are constantly evolving — the underlying infrastructure must be able to grow flexibly alongside these changes and function reliably. In this demanding industrial environment, Kraftanlagen has established a strong partnership with the BMW Group over decades. Kraftanlagen has supported the BMW Group as a reliable partner for over 50 years, providing framework agreements for fire protection and HVAC technology.

"We plan, supply and install utility systems ranging from heating, ventilation and cooling systems to domestic water systems, compressed air systems, and piping systems for gases, oils and lubricants. We place a particular focus on fire protection, from renovating and retrofitting existing sprinkler systems to constructing complete fire suppression systems, including water supply.'

Dirk ChristophelBusiness Unit Leiter Gebäudetechnik bei Kraftanlagen Energies & Services

Kraftanlagen has worked continuously with the BMW Group since 1963, serving the Dingolfing, Landshut, Regensburg and Wackersdorf plants. A key operational focus of these services is the Dingolfing plant — the BMW Group’s largest vehicle manufacturing facility in Europe.

In 2025, around 280,000 vehicles were produced here, including models from the 4 Series, 5 Series, 7 Series, and 8 Series, as well as the fully electric BMW iX. In addition to vehicle production, the site manufactures components for electric vehicles and body shells for Rolls-Royce Motor Cars.
© Image: BMW Group

“The framework agreements with the BMW Group cover both fire protection and HVAC services and, unlike one-off individual contracts, lay the foundation for a long-term, structured partnership.”

Martin DreherKey Account Manager Süd bei Kraftanlagen Energies & Services

© Image: BMW Group

To ensure close and efficient support, Kraftanlagen has established a permanent site in Dingolfing. Covering an area of 2,500 m², the site houses offices, workshops, storage areas and its own prefabrication facility. Complete assemblies are prefabricated there to minimise assembly times at the plant, avoid production downtime and comply with the highest safety standards – for example, during welding work. Assembly takes place primarily at weekends or on public holidays, when the production lines are at a standstill.
Around 25 Kraftanlagen employees are on duty in Dingolfing at all times as required.

‘The fact that we have supported BMW in Dingolfing continuously through framework agreements since 1972 is a strong sign of trust. One of the key reasons for this is our long-standing on-site presence, which includes a targeted inventory of spare parts, enabling us to respond quickly and flexibly at all times.”

Martin DreherKea Account Manager Süd bei Kraftanlagen Energies & Services