You can reach us at: +49 89 6237-0
Please sign up to read this document and the documents relating to all other projects.
Four old cremation lines made way for three new multi-deck furnaces with industrial burner systems and modern flue gas cleaning systems. The flue gas coolers operate with automatic soot blower systems, via an entrained flow process, the fabric filters ensure adherence to emissions values according to 27. BImSchV.
The renovation of the city's crematorium was conducted in two construction phases. The disassembly of the discontinued cremation technology with the subsequent erection and commissioning of the new cremation lines was completed while two furnaces each remained in operation.