In May 2017, the Austrian branch of Kraftanlagen München was commissioned with the installation of two turbines with a total capacity of 90 MW, including draft tubes, inlet spirals, rotors, guide vanes, turbine bearings, a compressed air system and an oil system with bearings and vessels.


The scope of service includes preassembly and the installation of two Francis turbines, as well as that of the various equipment for the air supply, hydraulic systems and their piping. 

 

Fact sheet

Customer: 
Voith Hydro GmbH & Co. KG


Period of execution: 
2017 - 2018


Plant parameters: 

  •  Runner diameter: 3,800 mm
  •  Heaviest component: 53 t
  •  Equipment overall: 410 t
  •  Working hours: approx. 18,000 