Decentralised power generation, hot water and steam supply

Renovation of the hot water generation station, Volkswagen plant, Kassel/Baunatal.

Environmental standards required the replacement of two hot water generators. The installation and commissioning of the new water pipe boilers had to be completed successively during ongoing heat supply operation. A particular emphasis was placed on the need for high plant availability.

Kraftanlagen Hamburg was tasked with all performance phases of erecting and commissioning the new boiler plant. The services included execution, structure, detailed and construction planning. In addition, we were responsible for the supply and erection of all technical systems, steels and pipeline construction as well as EI&C control technology. Our scope of services was capped by extensive documentation following commissioning and trial operation. The plants were installed in two construction phases during the ongoing operation of the existing plants.

Fact sheet

Customer:
VW Kraftwerke GmbH

Period of execution:

  • Order placed: 12/2008
  • Commissioning: 12/2009 and 09/2011
  • Handover to the customer: 02/2010 and 12/2011

Plant parameters

  • 2 hot water generators, 55 MWth, 130 oC, 16 barg each

    • Fuel 1: Natural gas H
    • Fuel 2: Heating oil El

Additional projects