Energy and power plant technology, piping construction

Piping systems for the brown coal-fired power plant with optimised plant technology (BoA) Neurath

Kraftanlagen München engineered and installed high-pressure piping systems for the expansion of a brown coal power plant, which consisted of two blocks with an output of 1,110 MW each. Kraftanlagen was responsible for the process design, engineering, design, procurement, fabrication, installation, quality assurance and commissioning as well as the trial operation and the documentation of the high-pressure piping systems. The Essen branch of Kraftanlagen München GmbH was responsible for project management.

Fact sheet

Customer:
RWE Power AG

Period of execution:
April 2008 to October 2011

Technical data:

  • Total pipeline weight: approx. 3,500 t
  • Dimensions of the hot reheat section silencer stand pipes: DN 1100 / äD. 1118.0 x 22.0 Wd.
  • Dimensions of the hot reheat section line: from liD. 720.0 x 43.0 MdWd to äD. 33.7 x 3.2 Wd.
  • Materials: P92, P91, WB36, 10CrMo9-10, 16Mo3