How to get in touch with us:

Any questions? Get in touch!

You can reach us at: +49 89 6237-0

Fabrication, power plant technology

Opole power plant in Poland, block 5 and 6 with 900 MW each

The scope of services of Finow Rohrsysteme GmbH includes the prefabrication of external high-pressure piping systems (LAB, LBA, LBB, LBC). 

Fact sheet

Customer:
GE

Period of execution:
2015 – 2016

Technical data:

  • Materials: X10CrWmoVNb 9 – 2, 10CrMo 9 -10, 15NiCuMoNb 5 – 6 – 4, 16Mo 3
  • Total weight of materials: 1,600 t per block

Additional projects

ImprintData ProtectionGeneral Terms and ConditionsDownloads for Business Partners