How to get in touch with us:

Any questions? Get in touch!

You can reach us at: +49 89 6237-0

Fabrication, renewable energies

Race Bank, offshore wind farm in Great Britain

FINOW Rohrsysteme GmbH was contracted with the production of S-Pipes as spool production via inductive bends.

 

Fact sheet


2015

Technical data:

3 J-Tubes

  • Pipe dimension: 750 x 20
  • Material: S355G7 + M
  • Bend radius/bend angle: R=5000/45°

17 J-Tubes

  • Pipe dimension: 457,0 x 15,9
  • Material: S355G7+M
  • Bend radius/bend angle: R=3200/45°

Period of execution:2015
Race Bank 02 (Great Britain), Burbo Bank (GB)

  •  3 J-Tubes 750 x 20 Material S355G7+M;  R=5000/45°
  • 17 J-Tubes 457,0 x 15,9 Material S355G7+M; R=3200/45°


Period of execution: 2015
Veja Mate (Germany)

  • 6 J-Tubes 610 x 20 Material S355G7+M;  R=5000/1,5 - 55°

 
 
Period of execution: 2016
Race Bank 01 (Great Britain), Walney 03 und Walney 04

  • 7 J-Tubes 750 x 20 Material S355G7+M;  R=5000/45°
  • 29 J-Tubes 457,0 x 15,9 Material S355G7+M; R=3200/45°

 

 

Additional projects

ImprintData ProtectionGeneral Terms and ConditionsDownloads for Business Partners
The cookies on this website are only used for technical purposes. They do not contain personal user data, which means that no user data are analysed or tracked. data privacy statement.
Agree