As general contractor, we were responsible for the engineering, procurement, construction and commissioning of a new steam turbine power station on the premises of a waste incineration plant. This includes the water-steam cycle, the turbine system with reheat system, buildings, electrical, instrumentation and control technology (EI&C systems) as well as the cooling water system with inlet and outlet structures.