Nuclear technology, power plant technology

Leibstadt power plant: Modification of the YU system

The scope of work of Kraftanlagen Heidelberg GmbH included:

  • Detailed engineering, installation of circulated pumps as well as the corresponding valves and piping systems for the modification of the reactor's forced circulation system YU 
  • Supply of pipeline parts and brackets
  • Certifications and stress analyses for piping systems and brackets
  • Main components DN 550/600
  • Safety class 1
  • Building regulation according to ASME section III, ENSI G11 and GSKL
  • Material: ASME SA-182-F316L / SA-965 F316L

Fact sheet

Customer:
Areva NP


 

 

 