How to get in touch with us:

Any questions? Get in touch!

You can reach us at: +49 89 6237-0

Fabrication, power plant technology

Kozienice 11 power plant in Poland

The scope of services of Finow Rohrsysteme GmbH includes the prefabrication of external high-pressure piping systems (LAB, LBA, LBB) in the machine hall of the Kozienice 11 power plant in Poland.

Fact sheet

Customer:
Mitsubishi Hitachi Power Systems Ltd.

Period of execution:
2014 – 2015

Technical data:

  • Services: 1075 MW
    Materials: X10CrWMoVNb 9 – 2 (43 t), X10CrMoVNb 9 – 1 (28 t), 10CrMo 9 – 10 (27,5 t),
    13CrMo 4 – 5 (21,5 t), 15NiCuMoNh 5 – 6 – 4 (225 t), 16Mo3 (51 t), P235 GH (140 t)
  • Total weight of materials: 536 t

Additional projects

ImprintData ProtectionGeneral Terms and ConditionsDownloads for Business Partners
The cookies on this website are only used for technical purposes. They do not contain personal user data, which means that no user data are analysed or tracked. data privacy statement.
Agree