How to get in touch with us:

Any questions? Get in touch!

You can reach us at: +49 89 6237-0

Fabrication, power plant technology

Kozienice 11 power plant in Poland

The scope of services of Finow Rohrsysteme GmbH includes the prefabrication of external high-pressure piping systems (LAB, LBA, LBB) in the machine hall of the Kozienice 11 power plant in Poland.

Fact sheet

Customer:
Mitsubishi Hitachi Power Systems Ltd.

Period of execution:
2014 – 2015

Technical data:

  • Services: 1075 MW
    Materials: X10CrWMoVNb 9 – 2 (43 t), X10CrMoVNb 9 – 1 (28 t), 10CrMo 9 – 10 (27,5 t),
    13CrMo 4 – 5 (21,5 t), 15NiCuMoNh 5 – 6 – 4 (225 t), 16Mo3 (51 t), P235 GH (140 t)
  • Total weight of materials: 536 t

Additional projects

ImprintData ProtectionGeneral Terms and ConditionsDownloads for Business Partners