How to get in touch with us:

Any questions? Get in touch!

You can reach us at: +49 89 6237-0

Industrial plants, new plant construction, plant conversion

Hüttenwerke Krupp Mannesmann, coke oven gas line in Huckingen plant

ThyssenKrupp Industrial Solutions AG commissioned Kraftanlagen München with the prefabrication and installation including the supports and operating platforms as well as the execution of reconnection work and preparation of workshop drawings for production.

Fact sheet

Customer:
ThyssenKrupp Industrial Solutions AG


Period of execution:
2013 – 2014


Plant parameters:

  • Material: 1.0345
  • Nominal pipe diameter: up to DN 2000
  • Piping: 560 m

Additional projects

ImprintData ProtectionGeneral Terms and ConditionsDownloads for Business Partners
The cookies on this website are only used for technical purposes. They do not contain personal user data, which means that no user data are analysed or tracked. data privacy statement.
Agree