How to get in touch with us:

Any questions? Get in touch!

You can reach us at: +49 89 6237-0

Utility services, air conditioning and ventilation technology

Hilton Hotel renovation, Paris

Renewal of the heating and cooling networks, smoke exhaust systems by Kraftanlagen:  In the hotel built in the 19th century, the guest floors with a total of 282 rooms are being renovated. Fan coils are being replaced in this endeavour and the entire heating and cooling network down to the basement is being renewed. The back office area, the bar and the preparatory kitchen are enhanced with regard to ventilation and refrigeration technology as well as fire protection. New smoke exhaust systems are being installed in the hotel hallways of the guest floors.



Fact sheet

Customer:
Chalon Propco SNC


Period of execution:
2014 – 2015

Additional projects

ImprintData ProtectionGeneral Terms and ConditionsDownloads for Business Partners
The cookies on this website are only used for technical purposes. They do not contain personal user data, which means that no user data are analysed or tracked. data privacy statement.
Agree