Via the Natural Gas Terminal (NGT) near Emden, approximately one-third of the German natural gas demand finds its way into the gas transportation networks. With a new, energy-efficient hot steam generation plant, Gassco Deutschland ensures Germany's natural gas supply at the Norsea Gas Terminal in Emden. Reliability the top priority.
The existing steam generation plant had to be replaced due to its old age. As its replacement, two new, effective hot steam generators were installed as twin flame pipe shell boilers with natural gas firing.
As technical general contractor, Kraftanlagen Hamburg carried out all performance phases of the project. The individual engineering phases included approval, execution, detailed and construction engineering. Our services included the procurement and installation of the hot steam generators and the secondary plant components, including the pipeline construction with the integration of the new plant into the existing facility. Erection and integration of the new boiler control and regulation systems into the existing power station control system as well as commissioning and trial operation of the entire plant completed our scope of services.