Underground piping system, gas and water

Gas and water services for the city of Nuremberg

In the Nuremberg metropolitan area, the services of Kraftanlagen München in 2014 included the engineering, procurement and construction of gas and water pipelines.

Kraftanlagen München laid gas pipelines with nominal pipe diameters from DN 25 to DN 300 on a line length of one kilometre as well as 21 domestic connection lines.
In addition, 1.4 km of water pipelines with nominal pipe diameters from DN 80 to DN 300 were laid. The scope of services also included 43 domestic connection lines.

 


Fact sheet

Customer:
N-ERGIE AG, Nuremberg

Period of execution:
2014


Gas pipeline construction:

  • Civil engineering work: Line length: 1,095 m
  • Pipelines: DN 330 - 25
  • Materials: HDPE, Steel
  • Domestic connection lines: 21


Water pipeline construction:

  • Civil engineering work: Line length: 1,540 m
  • Pipelines: DN 200 - 32
  • Materials: HDPE
  • Domestic connection lines: 43