In the metropolitan area of Pfaffenhofen, Kraftanlagen München engineered, supplied and installed a district heating network as well as a 1 km-long steam route to supply an industrial company. The length of the entire line measured 21,000 metres.

Fact sheet

Customer:
Biomasse Heizkraftwerk GmbH

Period of execution:
2001

Project data

  • Total line length: 21,000 m
  • Steam pipelines (SMR system): DN 200/450
  • Hot water pipelines (KMR system): DN 250 - DN 32
  • Transfer stations: 135 pieces

 