District heating main pipe in Salzburg

Salzburg AG tasked Kraftanlagen München with supplying and installing a district heating main pipe 2 x DN 400 as part of a future South/West connection. For crossing under the channels, installation in protective pipes in insulators takes place.

Fact sheet

Customer:
Salzburg AG

Period of execution:
03/2015 – 09/2016

Project data

  • Total line length: 1,250 m
  • Hot water pipelines (KMR system): 2 x DN 400
  • Laying of protective pipes: approx. 25 m

 