You can reach us at: +49 89 6237-0
Please sign up to read this document and the documents relating to all other projects.
As a system house, Kayser –Threde GmbH, which specialises in the development and implementation of high-tech aerospace solutions, participated in the production of the Galileo satellites for the European GPS system.
During the new construction of a production and administrative building, Kraftanlagen München was commissioned in 2014 to implement the entire utility supply and ventilation technology. The order included engineering, procurement, construction and commissioning of the ventilation, heating, refrigeration and EI&C technology including the qualification of 3 clean rooms.