During the construction of the steam turbine power station in the Dutch city of Moerdijk ECM - Ingenieurunternehmen für Energie- und Umwelttechnik GmbH was responsible for engineering the integration…
read more
As a system house, Kayser –Threde GmbH, which specialises in the development and implementation of high-tech aerospace solutions, participated in the production of the Galileo satellites for the…
read more
Kraftanlagen Hamburg built two separate CHP plants with total outputs of 10.6 MWel and 12.1 MWth at the Airbus air plane hangar in Hamburg-Finkenwerder.
read more
Aurubis is one of the world's largest producers of coppers and Europe's largest recycling company. High-quality copper is produced from copper concentrate and recycling materials and then processed…
read more
At its Moorburg location in Hamburg, the energy provider Vattenfall operates a hard coal-fired power plant with two blocks that each feature an electrical power performance of 865 MW and a heat…
read more
IPIP S.A. was charged to develop the final concept for the coke drums structure reinforcement and for the new coke drums structure in coker unit 3 (CX3).
read more
The buildings are heated and cooled via a joint heat pump system (Building S) and connected ground source absorber. Heating and cooling is accomplished via a cooling ceiling system. In addition, each…
read more
A three-party intergovernmental agreement between CERN and the host countries of France and Switzerland has regulated the disposal channels and the acceptance criteria for radioactive waste from the…
read more
In the Augsburg plant of MAN Diesel und Turbo SE, we were responsible for the supply and installation of the piping system for cooling water, lubricating oil, fuel, air and hot water A very tight…
read more
As part of the 2017 turnaround of the BP refinery in Lingen, Kraftanlagen München (KAM) was awarded a general contractor assignment to renovate two coker furnaces.
read more
In the former building of the Germany stock exchange, the kitchen and the cafeteria were redesigned. When that was completed, the entire cooling ceiling was removed in the office areas, passive…
read more
New construction of an administrative building with connected production facility for Deublin GmbH, a manufacturer of mechanical components. The entire technical building services (with the exception…
read more
Salzburg AG tasked Kraftanlagen München with procuring and constructing a district heating main pipe 2 x DN 400 as part of a future South/West connection.
read more
In the metropolitan area of Pfaffenhofen, Kraftanlagen München engineered, procured and constructed a district heating network as well as a 1 km-long steam route to supply an industrial company.
read more
Our range of services includes the engineering, procurement and construction of district heating pipelines, including transfer stations for the heat distribution, in Munich's metropolitan area.
read more
In order to be able to optimally support Nuremberg's district heating, Kraftanlagen München maintains a technical office and a storage facility in Nuremberg's metropolitan area.
read more
The decommissioning of the Karlsruhe reprocessing plant has been in full swing since 1996 and Kraftanlagen Heidelberg has been involved from the start in this comprehensive shutdown, decommissioning…
read more
E.ON Energy from Waste GmbH operates a power plant that primarily burns alternative fuels. Companies located in the industrial park of Premnitz as well as Premnitz municipal utilities receive process…
read more
Finow was tasked with engineering, material procurement and prefabrication of the live steam and hot reheat section pipelines for Block 8 of Moscow's heating plant No. 16. The power plant block with…
read more
As general contractor, we were responsible for the engineering, procurement, construction and commissioning of the new Line 3 heat recovery steam generator for power and heat generation in the…
read more
As general contractor, we were responsible for the engineering, procurement, construction and commissioning of the new Line 3 heat recovery steam generator for power and heat generation in the…
read more
For Erlanger Stadtwerke AG, ECM Ingenieur-Unternehmen für Energie- und Umwelttechnik GmbH was responsible for the general engineering of the heating power plant expansion of the new gas turbine with…
read more
Infineon Technologies AG commissioned Kraftanlagen München with the construction engineering as well as the execution and commissioning of two chillers and an emergency heat exchanger to extend the…
read more
Finow Rohrsysteme GmbH has been selected to manufacture the pipe bends for the roofing of Al Wasl Plaza, the central hub of the Expo 2020 world exhibition in Dubai.
read more
Deutsche Post AG maintains approx. 100 mail centres throughout Germany that were built until the mid-1990s. Due to a steady increase in processed mail as well as changes and expansions to the…
read more
Our services included engineering, procurement, construction and commissioning as well as the trial operation of the energy and district heating control centre.
read more
In the Bayreuth metropolitan area, Kraftanagen München was commissioned in 2014 with engineering, procurement and construction of gas and water pipes.
read more
In 2014, Kraftanlagen München engineered, supplied and installed gas and water pipes in the city of Munich and the surrounding area for Stadtwerke München
read more
In the Nuremberg metropolitan area, the services of Kraftanagen München in 2014 included the engineering, procurement and construction of gas and water piping.
read more
As general contractor, Kraftanlagen München built a state-of-the-art gas-fired heating power plant with combined heat and power generation at the Kiel Fjord.
read more
With a new, energy-efficient hot steam generation plant, Gassco Deutschland ensures Germany's natural gas supply at the Norsea Gas Terminal in Emden. Reliability the top priority.
read more
Kraftanlagen München built the district heating supply networks using the geothermal energy of Munich's surrounding area, for example from Aschheim, Erding, Unterföhring or Unterschleißheim.
read more
Standard KTA 1403 on ageing management in nuclear power plants, which was developed based on proposed standard KTA2301, had to be applied and implemented in power reactors in operation in Germany. …
read more
Kraftanlagen Heidelberg provided design services in the areas of machine construction and apparatus engineering which also included vacuum and cryogenic requirements.
read more
Our scope of services included the mechanical installation services during the legally mandated plant shutdown. The construction period spanned 3 weeks and 160 employees worked on the project.
read more
The scope of services of Finow Rohrsysteme GmbH included the wall tubing and cross-bracing production as well as the container installation including bundles and gauze clamping device.
read more
The scope of the work included the 3D model and the analysis of the piping systems with the calculation program Rohr2 (Sigma) according to FDBR including the verification of the steel structure for…
read more
Renewal of the heating and cooling networks, smoke exhaust systems by Kraftanlagen: In the hotel built in the 19th century, the guest floors with a total of 282 rooms are being renovated. Fan coils…
read more
ThyssenKrupp Industrial Solutions AG commissioned Kraftanlagen München with the prefabrication and installation, including the supports and operating platforms, as well as the execution of…
read more
E.ON Kraftwerke GmbH tasked Kraftanlagen München with the engineering, procurement, construction and commissioning of the HVAC-Systems of its Datteln 4 power plant.
read more
Kraftanlagen München GmbH was commissioned with the installation of the turbine and generator with a capacity of 270 m3/s. The generator’s output is 23 MVA. The project was conducted by the Austrian…
read more
In August 2017, Jakob Ebling GmbH was commissioned by Apleona GVA with the replacement of cooling towers on the 41st floor of the City Haus 1 building of DZ-Bank in Frankfurt am Main.
read more
Siemens AG GERIC BT West tasked Kraftanlagen München with the engineering, procurement and construction of the fire fighting pumps, the exterior fire hydrant ring main as well as the spray water and…
read more
The fusion reactor ITER, an international research project, has been built in Cadarache in the south of France since 2012. Kraftanlagen Heidelberg has created two concepts for the retention of tritium…
read more
When the decision was reached to erect ITER in France and not, as was originally planned, in Japan, it became necessary to ensure the plant's safety according to European standards for nuclear…
read more
The fusion reactor ITER, an international research project, has been built in Cadarache in the south of France since 2012. Kraftanlagen Heidelberg has created two concepts for the retention of tritium…
read more
As general contractor, in collaboration with the German Aerospace Centre (DLR) and the Jülich Solar Institute (SIJ), we were responsible for the engineering, procurement, construction and…
read more
As general contractor, we completed a 135 MW combined heat and power generation unit at the Kladno brown coal power plant near Prague, taking the project from the planning stage right through to…
read more
During the construction of the quickly controllable Kiel gas engine heating power plant ECM - Ingenieurunternehmen für Energie- und Umwelttechnik GmbH was tasked with engineering the heating power…
read more
During the erection of block K of the Kladno brown coal power plant, ECM - Ingenieur-Unternehmen für Energie- und Umwelttechnik GmbH was tasked with engineering the water-steam cycle with district…
read more
The scope of services of Finow Rohrsysteme GmbH includes the prefabrication of external high-pressure piping systems (LAB, LBA, LBB) in the machine hall of the Kozienice 11 power plant in Poland.
read more
The decommissioning of the storage facility and evaporation system (LAVA) on the premises of the Karlsruhe reprocessing plant required the separation of the emission monitoring. For this purpose, a…
read more
The scope of work of Kraftanlagen Heidelberg GmbH included the detailed engineering and installation of circulated pumps as well as the corresponding valves and piping systems for the modification of…
read more
As part of the Leiding over Noord project in the Netherlands, Isoplus Fernwärmetechnik GmbH tasked us with supplying 459 inductive bends for a district heating pipe.
read more
As general contractor, we were responsible for engineering, procuring, erecting and commissioning the third combined-cycle line of the district heating power plant.
read more
The Deutsche Krebsforschungszentrum (German Cancer Research Centre), a biomedical research institute for the development of new strategies for the prevention and cure of cancer, is located near our…
read more
Hamburger Krematorium GmbH operates two crematoriums in Hamburg with a total of six furnace lines. Kraftanlagen Hamburg equipped the Öjendorf crematorium with new process technology in 1999 and 2000…
read more
The biomass heating power plant, which Kraftanlagen Hamburg erected in Berlin's Neukölln district in 2003 for Harpen EKT, supplies the Gropiusstadt residential area and Neukölln hospital with heat.
read more
The Bielefeld crematorium was built by Kraftanlagen Hamburg in 1998. The plant, located on Sennefriedhof, is among Europe's most state-of-the-art and environmentally friendly incineration plants and…
read more
Tivoli Malz in Hamburg produces up to 110,000 t of Pilsener malt every year. In addition to supplying customers in northern Germany, lorries also deliver the malt to Scandinavia and it is shipped…
read more
The energy centre of the Westfälische Wilhelms-Universität in Münster has been supplying the entire university, the university medical centre as well as additional state facilities with steam,…
read more
As general contractor, we implemented the engineering, procurement and construction of the biomass heating power plant on the Friesenheimer Island in Mannheim.
read more
In 1998, Kraftanlagen Heidelberg (KAH), as part of a consortium with Assystems Services (formerly Thales), Paris, was tasked with taking over the full-time design and engineering planning of the Large…
read more
As part of the new construction of a double-block hard coal-fired power plant in Hamburg-Moorburg, Kraftanlagen München was tasked with the erection of the medium-pressure/low-pressure piping systems…
read more
Kraftanlagen München was responsible for the engineering, procurement, fabrication, construction, quality assurance and commissioning as well as the trial operation and the documentation of the…
read more
MiRO commissioned Kraftanlagen München with pipeline-related work during the general shutdown of three parts of the plant. The order included the disassembly and reassembly of pipelines including the…
read more
General contractor for engineering, erection, installation, commissioning and trial operation for the modernisation of steam turbines, including new air condenser, EI&C systems and the building,…
read more
As general contractor, we were responsible for the engineering, procurement, construction and commissioning of a new steam turbine power plant on the premises of a waste incineration plant.
read more
As part of the new construction of a hard coal-fired power plant in Hamburg-Moorburg, Kraftanlagen München was commissioned with erecting the medium pressure/low pressure piping systems in January…
read more
One of the operating rooms no longer met new technological and hygiene requirements and had to be demolished. A new operating room area with pre-op and post-op facilities as well as a recovery room…
read more
The scope of services of Finow Rohrsysteme GmbH included: Wall tubing, 22 spiral heating surfaces for evaporators, 1 set of collectors/distributors as well as pre-heating heating surface, fully…
read more
The scope of services of Finow Rohrsysteme GmbH included 23 spiral heating surfaces, wall tubing, 23 collectors/distributors as well as connection lines.
read more
With an electrical power performance of 1,999 kW, the new CHP plant covers a part of the required electrical energy of NXP Semiconductors in Hamburg.
read more
The task was to evaporate the large amount of waste water, which accumulated as a result of shut down and decommissioning operations, with a new process technology.
read more
During coolant cleaning TR01-TR04, used and radioactively contaminated ion exchange resin are accrued. Until they can be disposed, they are stored temporarily in resin waste containers. The…
read more
On the premises of the Eppendorf university medical centre, the energy centre of the hospital was completely renovated and rebuilt as an auxiliary and peak load heating plant that ensures the supply…
read more
On the premises of the Barmbek medical centre, the energy centre of the hospital was completely renovated and rebuilt as an auxiliary and peak load heating plant that ensures the supply of the medical…
read more
In Romania, Kraftanlagen München completed an order at the Petrom refinery that included the conversion and new construction of a crude oil distillation system and the coker.
read more
Due to a non-linear calculation, the effects of the load case design earthquake on the spraying unit line TH16 Z112/110 were supposed to be determined. The analysis was completed using the method of…
read more
Kraftanlagen Heidelberg GmbH carried out the new design and erection of the decontamination area with integration in the existing construction and plant areas of the Philippsburg nuclear power plant.
read more
Kraftanlagen Heidelberg was tasked with the design and fabrication of a plug for sealing the control rod drive enclosure tubes in the base calotte of the reactor pressure vessel (including proof of…
read more
Kraftanlagen Heidelberg was tasked with the design, calculation and fabrication of a fuel element coring rig for Block 2 of the Philippsburg nuclear power plant.
read more
The determining factors were the boundary conditions: the crane trolley has to drive with the crane bridge and an increased dose rate could be expected outside of the parking and waiting positions.…
read more
Since being switched off in 2011, the Philippsburg 1 boiling water reactor has been in the so-called post-operation mode. The post-operation phase ends as soon as the permission has been granted to…
read more
Kraftanlagen München engineered and installed high-pressure piping systems for the expansion of a brown coal power plant, which consisted of two blocks with an output of 1,110 MW each.
read more
In October 2015, the Kraftanlagen München GmbH was commissioned with an order for the engineering, procurement and construction of the primary and secondary cooling water system and pipelines of the…
read more
Finow Rohrsysteme GmbH manufactured 65 gas collectors and 240 water collectors for linear coolers that are used in plants to generate ethyls from shale gas.
read more
Framework agreement for the provision of radiation protection services during the power operation and dismantling of the Philippsburg, Neckarwestheim and Obrigheim nuclear power plants.
read more
A second water chiller was integrated in the existing "power plant" refrigeration generation, and the cooling tower on the roof was expanded through an evaporative cooler.
read more
For SEW-EURODRIVE – a producer of drive engines, frequency converters as well as control and servo technology based in Graben-Neudorf – the industrial service of the Heidelberg branch of Kraftanlagen…
read more
Replacement of a modular convection zone (five individual modules and eight pipe bundles). Prefabrication and installation of pipelines, including non-destructive material examination, coordination of…
read more
In the Landsberg plant of 3M Deutschland GmbH, Kraftanlagen München retrofitted the sprinkler system, including the corresponding water supply, during ongoing operation. The acceptance was conducted…
read more
Holzammer Kunststofftechnik GmbH commissioned Kraftanlagen München with engineering, procurement and construction of the sprinkler system of its company building complex, including the corresponding…
read more
In 2014, the HVZ GmbH & Co. Objekt KG, represented by the Hypo-Bank Verwaltungszentrum GmbH, commissioned Kraftanlagen München for the revitalisation of the HVB tower sprinkler protection, as well as…
read more
Kraftanlagen München conducted the legally mandated risk assessment of drinking water systems in apartment buildings. The water coming from a drinking water installation must always meet all…
read more
As a result of a decision reached by the G7 and a German-Russian intergovernmental agreement, the German government-owned Energiewerke Nord (EWN), together with Russian's Kurchatov Institute, built a…
read more
As general contractor, we were responsible for engineering, procurement, construction and commissioning as well as the trial operation of the Sandreuth biomass heating power plant
read more
DLR commissioned Kraftanlagen München with the construction engineering, execution and commissioning of three chillers to expand the existing cooling network (including the underground piping…
read more
OMV Deutschland tasked us with the demolition as well as the prefabrication and new installation of pipelines including integration points and brackets as well as the revision of vessels.
read more
Engineering and fabrication of a high-temperature receiver for a tower power plant on the basis of an open volumetric receiver with ceramic inserts.
read more
At BMW Motoren GmbH in Steyr, Kraftanlagen München was responsible for the engineering and supply as well as the disassembly and reassembly of the sprinkler system for the high-bay storage area during…
read more
Kraftanlagen München supplied and installed district heating pipes in the supply tunnel, including insulation, for the Technische Universität München-Garching.
read more
Technocell Decor GmbH & Co. KG, a company that is part of the Felix Schoeller Group, produces high-quality special papers at its location in Titisee-Neustadt.
read more
In May 2017, the Austrian branch of Kraftanlagen München was commissioned with the installation of two turbines with a total capacity of 90 MW
read more
More than 400 employees, nearly ten years of underground construction in the high mountains, 17 km of tunnels and 1.7 million m³ of removed rocks: The Nant de Drance construction project in the Valais…
read more
During TÜV Süd's construction of Europe's largest independent air conditioning and refrigeration technology laboratory in Olching, Kraftanlagen München was responsible for the entire utility supply…
read more
On behalf of Gazprom as well as the project EPC contractor SRDI Oil & Gas Peton, Linde will carry out the construction of a medium-size plant complex for the production, storage and transport of…
read more
Started back in 2009, the project based in Sichuan province involves the vitrification of highly radioactive legacy waste from a reprocessing plant near the city of Guangyuan, which has a population…
read more
Multi-deck furnaces were able to be integrated optimally in the predefined building cubature and the downstream flue gas cooling and cleaning systems were installed in the two-storey basement area.
read more
For Stadtwerke Winterthur, Kraftanlagen München supplied and installed a complete piping system as a district heating supply line in a tunnel for the connection of a local heating territory.
read more